Swept Path
Reports

Council-approved analysis for residential, commercial, industrial and infrastructure planning applications. UK-wide. CLP Advanced Practitioner certified.

Residential

From single dwellings to large housing developments, we produce swept path reports that satisfy local authority highways requirements first time.

60+
Residential reports approved
UK
Wide coverage, any local authority
CLP
Advanced Practitioner certified (CLOCS)
48hr
Standard report turnaround
24-unit residential development, Birmingham
Birmingham, West Midlands

24-Unit Residential Development

Swept path analysis for refuse vehicle and fire appliance access across a new 24-unit residential scheme. Approved by Birmingham City Council highways on first submission.

View case study
8-dwelling infill site, Northampton
Northampton, East Midlands

8-Dwelling Infill Site

Private cul-de-sac turning head analysis for a small infill development, demonstrating B85 vehicle compliance with Manual for Streets standards.

View case study
Mixed-tenure housing scheme, London
London, Greater London

Mixed-Tenure Housing Scheme

Construction Logistics Plan including swept path analysis for construction phase vehicle movements on a constrained urban site. CLOCS-compliant, accepted by TfL.

View case study
Clients we have worked with
Architects
Housing Associations
Planning Consultants
SME Developers
Self-Build Clients

Commercial

Retail parks, offices, hotels and mixed-use schemes all require swept path sign-off for service and delivery vehicles. We produce drawings compliant with TSRGD and local authority design guides.

25+
Commercial reports delivered
UK
Wide coverage, any authority
HGV
Articulated and rigid vehicle templates
48hr
Standard turnaround
Retail park extension swept path analysis, Leicester
Leicester, East Midlands

Retail Park Extension

Swept path analysis for articulated HGV access to extended service bays, using DfT LGV templates. Approved by Leicestershire highways on first submission.

View case study
Hotel development coach and taxi access, Manchester
Manchester, Greater Manchester

Hotel Development: Coach and Taxi Access

Multi-vehicle swept path analysis for a new hotel including coach drop-off, taxi rank and servicing access. Coordinated with Transport for Greater Manchester.

View case study
Office campus car park design, Bristol
Bristol, South West

Office Campus: Car Park Design

Car park swept path analysis confirming disabled bay, standard bay and delivery access comply with BS 8300 and local planning conditions.

View case study
Clients we have worked with
Retail Developers
Hotel Groups
Office Developers
Planning Consultants

Industrial &
Logistics

Warehouses, distribution centres and trade parks require multi-vehicle swept path analysis for articulated HGVs and specialist vehicles. We produce CAD drawings accepted by highways authorities nationwide.

16.5m
Max artic vehicle length modelled
UK
Wide coverage nationwide
NPPF
Compliant reports every time
24hr
Rush turnaround available
Distribution centre artic HGV yard swept path, Coventry
Coventry, West Midlands

Distribution Centre: Artic HGV Yard

Full yard swept path analysis for a 40,000 sqft distribution centre confirming articulated HGV entry, exit and loading bay access. CAD drawings submitted and approved.

View case study
Trade park multi-tenant service access swept path, Milton Keynes
Milton Keynes, South East

Trade Park: Multi-Tenant Service Access

Swept path analysis for a multi-unit trade park demonstrating shared service road capacity for rigid and articulated delivery vehicles.

View case study
Waste transfer station specialist swept path, Leeds
Leeds, West Yorkshire

Waste Transfer Station

Specialist swept path analysis for refuse compactors and skip lorries accessing a new waste transfer facility. Approved by Leeds City Council on first submission.

View case study
Clients we have worked with
Logistics Developers
Industrial Agents
Planning Consultants
Waste Operators

Infrastructure

Highways junctions, roundabouts, access roads and utility works all require swept path evidence as part of S278 and S38 agreements. We produce CAD drawings accepted by highways authorities nationwide.

S278
Agreement drawings accepted
DMRB
Compliant vehicle templates
100%
CAD drawings included
2+
Years delivering highway reports
Priority junction S278 swept path evidence, East Midlands
East Midlands

Priority Junction: S278 Evidence

Swept path analysis demonstrating design vehicle compliance at a new priority T-junction. CAD drawings accepted by the highways authority.

View case study
Roundabout design vehicle swept path check, West Midlands
West Midlands

Roundabout: Design Vehicle Check

Swept path analysis for a new single-lane roundabout confirming adequate tracking for a design SU vehicle and refuse vehicle, in compliance with TD 16/07.

View case study
Access road construction logistics swept path, Yorkshire
Yorkshire

Access Road: Construction Logistics

Construction phase swept path analysis for a new access road showing concrete mixer, tipper and mobile crane routing to satisfy planning conditions.

View case study
Clients we have worked with
Highway Engineers
Civil Engineering Firms
Planning Consultants
Utility Companies

Who Does
the Work

Every swept path report is produced by Malvin T. Somane directly. No outsourcing, no junior technicians. You know exactly who is working on your instruction.

Malvin T. Somane
Founder, Tourd Group

Malvin founded Tourd Group after qualifying as a CLP Advanced Practitioner through CLOCS, the national standard body for construction logistics in the UK. His name is listed on the CLOCS national practitioner register.

Every report is produced using industry-standard CAD simulation software, the same tool used by highways consultants and local authority engineers across the UK. Drawings reference the correct technical standards for each project type: Manual for Streets, TD 16/07, DMRB, TSRGD, and the relevant local design guide.

Before founding Tourd, Malvin spent two years as a Senior Technical Consultant at WPS Compliance Consulting, advising local authorities including the London Boroughs of Hammersmith and Fulham, Hackney, and Enfield on ISO 14001 environmental management, BREEAM assessments, and planning compliance. He holds a certificate from the Cambridge University Judge Business School in Sustainability, ESG, Biodiversity, and Sustainable Urban Development.

His background as a Lead Business Systems Analyst brings structured, evidence-based precision to every report. Reports are written clearly for planning consultants and agents, with technical content accessible to planning officers without specialist knowledge.

CLOCS
CLP Advanced Practitioner
Listed on the CLOCS national practitioner register. The top-tier UK qualification in construction logistics planning.
TOOL
CAD Software
Industry-standard CAD simulation software. The same tool used by highways consultants and local authority engineers UK-wide.
LA
Local Authority Track Record
Prior client work with the London Boroughs of Hammersmith and Fulham, Hackney, and Enfield via WPS Compliance Consulting.
CAMB
Cambridge University Certificate
Judge Business School. Sustainability, ESG, Biodiversity and Sustainable Urban Development. 2022.
ISO
ISO 14001
Environmental management programmes delivered across multiple local authority planning compliance projects.
BREEAM
BREEAM Assessment Experience
Building sustainability assessment methodology. Applied across planning compliance and construction sustainability projects.

Need a swept
path report?

Send your drawings today. A council-ready report back within 48 hours.

Get in touch